This is an independent 205,000
SF, 5-story extension of the main hospital complex. The
dedicated heart hospital houses 6 operating rooms and
6 cath labs. The first phase includes 90 universal patient
rooms and provisions to increase that number with the
addition of two more partial floors.
Great care was taken to match the
existing floor levels in the adjacent main hospital building
in anticipation of the next phase which will include a
planned expansion of diagnostics and surgery. The ground
level of this building also houses the relocated central
sterile supply department of the complex, which also serves
as one of the main terminals of the automated guided vehicle
(AGV) materials management system that was installed to
serve the entire OSU Medical Center.
The project also includes a 1,000-car
parking garage, connected to the Heart Hospital with a
pedestrian bridge.
|