| A 1995 campus-wide facility assessment
indicated that Battelle's research would be best served
if several laboratories located in older buildings were
consolidated in a new facility.
The primary edict from the Project
Program was that the new facility be functional and flexible
with labs designed on a generic basis to enhance future
adaptability. The result was a 3-story building with interstitial
floors and clear structural spans. |